A COMPLETE ALTEC GREEN END
Thu Jun 20 2024
Altec is delivering what will be the state-of-the-art and one of the most modern plywood plants in North America. This system is capable of:
- Sustained production of at least 480,000 sqft per 8-hours on a 3/8” basis.
- Can successfully peel fast-growth, plantation southern yellow pine.
- Significantly reduced and simplified maintenance and setup requirements.
- Able to maintain production and quality over the long-term with the operations and maintenance personnel.
The Altec Green End is installed, complete with the following improvements:
- New Altec Electric spindles c/w independent AC spindle motors.
- Electric back-up roll positioning and lift.
- Hardened, machined fixed knife bed in carriage combined with easy-to-use, precision knife-setup table.
- Use of Taihei-ground multi-bevel knives.
- Incising (spiked) roller bar.
- Electric knock-off on the veneer stackers.
In addition, it boasts additional operational improvements:
- Fewer operators required
- Simplified maintenance and setup.
- Simplified operator interface.
- Service contracts available, including evaluation and training of mill personnel.